We carry a premium blend of Bluegrass Sod proven winter hardy for our climatic conditions.  Check for availability, pricing and special orders.

1.  Apply      a minimum of eight centimeters (3 inches) of fertile topsoil or till existing topsoil to the same depth if it is of good quality.  A ten centimeter depth is preferred in both cases.

2. Grade      topsoil as required.  A “level” lawn must have a slope of a least 1 cm. of fall per meter (1” in 10”) to carry away surface water.

3. Fertilize   topsoil as per A World of Gardens recommendations, or fertilize with a turf fertilizer within two weeks of installation. 

4. Rake        to fill water holding depressions and to make a flat smooth surface for better bonding.

 

5. Install       sod making sure the joints are staggered and the pieces are pressed tightly together.  Sod should be installed as soon as possible or no later than 24 hours.

6. Water      within one hour of laying with enough water to soak the topsoil to a depth of five centimeters (2 inches);  then, every 2nd day for 2 weeks.  Water evenly and slowly so that it penetrates to a depth of five centimeters.  Water in the evening for best results.

7. Mow        after one week at a height of four centimeters (1- ¾ inches).  Keep mower blades sharp.